RCI method - List of Manufacturers, Suppliers, Companies and Products

RCI method Product List

1~1 item / All 1 items

Displayed results

Ground reinforcement RCI method

No need for concrete replacement! Ground construction can be done without stopping operations.

We would like to introduce our "Ground Reinforcement RCI Method." Floor construction that would normally take one month if redoing the concrete can be completed in approximately 1 to 2 days. The construction period is shorter, reducing costs to about two-thirds, and the load-bearing capacity of the concrete increases by 1.5 times. Please feel free to contact us when you need our services. 【Features】 ■ Short construction period ■ Low cost ■ High quality *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method
  • Ground improvement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration